Nailbase 2-Ci Installation Instructions

Home / Library / Literature / Installation Instructions / Nailbase 2-Ci Installation Instructions

Nailbase 2-Ci Installation Instructions


Before starting installation, ensure that the installation complies with the applicable building code requirements. The building code may have requirements for thickness and R-value of the insulation, vapor retarders, interior thermal barriers and finish materials, exterior weather resistive barriers and claddings, ventilation, insulation in adjacent areas, caulking and sealing, and other items.

Please find below, complete installation instructions available for download.

  Foam-Control Nailbase 2-Ci Installation Instructions


Application of Foam-Control Nailbase 2-Ci to a Wood Framed Wall:

Nailbase 2-Ci Installation Instructions to a wood framed wall


As the installer, you are solely responsible for the proper installation of all materials, following product label instructions and for using proper safety precautions during installation to avoid injury. The Foam-Control manufacturer is not responsible for building design and accepts no responsibility for the performance of its products resulting from improper building design, construction faults, or defective installation workmanship.